The fuel storage facility at Salt Lake City (SLC) International Airport is managed and operated by Aircraft Service International Group (ASIG). This includes the day-to-day operation of the fuel facility and associated hydrant system that is used to distribute fuel to the ramp. In 2009, ASIG commissioned an independent operational feasibility study of the fuel facility. The resulting report identified the existing inventory management and control system was reaching the end of it’s service life and was not in line with current industry standards.
Over it’s 60 year history, ASIG has grown to one of the industry’s largest independent providers of commercial aviation services. The company’s operational, management, quality, safety and training programs are recognized by the airlines they serve, as well as the Federal Aviation Administration (FAA) and other regulatory agencies. ASIG consistently blends experience, technology and innovation to safely deliver consistent and reliable services that offer real quality and value.
The aging system utilized relays and custom software to control pumps, valves and emergency shut-off stations. The critical industrial logic running directly from the operations computer was an inefficient method of implementing control logic when compared to current Programmable Logic Controllers (PLCs). If the system crashed, the entire site would need to be manually operated until the operations computer could be rebooted and the logic re-loaded – a situation that would be considered dangerous by today’s control and automation standards. Also, the logic programming did not allow the most efficient methods of controlling pump sequencing and cycling, which in turn caused excessive wear on the facility’s fuel pumps and spikes in power requirements.
Varec’s competitive solution proposal was accepted with the following integrated elements.
The project was performed in three distinct phases. During phase one, Varec system engineers pre-configured, tested and validated the FuelsManager and PLC systems at the headquarters and manufacturing facility in Atlanta, Georgia. During this time, ASIG managed all on-site tank preparation and instrument installation. The on-site commissioning of the new tank gauging system, including FuelsManager, tank gauges and the 8130 RTU was performed during phase two. Phase three transferred all monitoring and control to the new PLC system. Within each phase, the facility maintained operations without affecting aircraft fueling operations. The teamwork, commitment and organizational skills of all involved allowed the project, which was originally planned to be completed over a 6 month period, to be completed in just three months. Upon completion, the Varec solution fulfilled all customer requirements and provided other benefits not initially requested in the scope.